Tesla Supercharger stalls attract EV drivers and can boost nearby business traffic. Tesla builds, owns and operates the stations, partnering with property hosts (hotels, retailers, parking facilities, etc.). Tesla’s Supercharger network is a proprietary high-speed charging system built and operated by Tesla (over 17,000 plugs in the US). Unlike a franchise, Tesla partners with site owners: Tesla designs, pays for and maintains the chargers, while hosts provide the land and coordinate local requirements. Tesla handles equipment, construction and electricity (including grid fees) for Superchargers, so hosts incur minimal direct costs. In effect, hosting a Supercharger is a collaborative investment: you contribute the site and prepare it for high power, and Tesla invests in the EV charging infrastructure.
Recommended:
Tesla owns the Superchargers and their operation. The company covers charger hardware, installation labor and ongoing maintenance. (Notably, Tesla also pays the electricity used at Supercharger sites, so hosts don’t face the energy bill for charging sessions.) In return, your business gains exposure to Tesla drivers via the in-car navigation system, which directs EVs to Superchargers. Tesla lists approved locations on its public map, driving traffic to host sites. (Tesla has even begun opening many Superchargers to all EVs with the NACS adapter, broadening the customer base). You are not charged fees or royalties by Tesla for hosting. Instead, you benefit from increased foot traffic and longer customer dwell time. In some cases, site hosts negotiate a lease or a small revenue share from charging fees, though most benefit indirectly through added sales.
Key Point: Tesla treats hosts as partners. Tesla “manages construction and operation” of Superchargers on your site, so you have “nothing extra required. Hosts mainly provide the land and handle utilities/permitting.
Recommended:
Tesla’s Switch to the NACS Connector: What U.S. EV Drivers Need to Know
Successful Supercharger sites meet Tesla’s criteria for space, traffic and amenities. Key requirements include:
Parking & Space: Typically 8–12 dedicated parking stalls (or more) are needed. Tesla generally looks for at least 8 parking spaces near amenities. The stalls should be grouped together, with room for charger pedestals or canopies.
High Traffic Location: Sites on busy corridors, near highway exits, shopping centers, hotels or restaurants are preferred. Tesla’s in-car navigation will send EV drivers to the nearest Supercharger. Busy travel or commuter routes (often along Interstate corridors) maximize usage.
Amenities & Dwell-Time Services: Proximity to restrooms, cafes, convenience stores, restaurants, and Wi-Fi is ideal. Studies show EV drivers spend charging time purchasing snacks and coffee – businesses near chargers see an average +$1,500 in annual sales post-install. Sites with shopping, dining or entertainment encourage longer stays and extra revenue.
Ease of Access: Level, well-lit sites with clear signage (and easy entry/exit for vehicles) improve the customer experience. ADA-compliant parking layouts (11×20 ft stalls for accessibility) and pedestrian paths should be included.
Utility Capacity: Your property must handle the heavy electrical load. Superchargers typically require high-voltage three-phase power (commonly 480V AC or medium-voltage distribution with on-site transformers). Discuss with your utility early to confirm capacity. Tesla will specify exact power needs, but in general plan for megawatt-scale service (e.g. V3 Supercharger stalls can draw ~250 kW each).
By meeting these criteria, hosts tap into Tesla’s EV driver base. As one analyst notes, “if you own or lease a shopping center, hotel, gas station, or even a parking lot, you could be eligible to host Tesla Superchargers—turning your property into a revenue-generating asset.
Pre-Application: Assess feasibility. Engage Tesla early by visiting the Tesla Host Application page. Prepare basic info: address, site plan, expected stall count, nearby amenities, and existing electrical capacity. In parallel, consult your utility to estimate upgrade costs.
Submit Application: Through Tesla’s site or sales team. Provide details on location, property owner contact, traffic counts, and amenities. Tesla will evaluate factors like traffic demand and grid readiness. According to Tesla sources, approval can take several months.
Site Survey & Agreement: If preliminarily accepted, Tesla conducts an on-site survey with engineers. They confirm space for chargers, check electrical service, and work with you on a draft agreement. Tesla generally covers site preparation related to the chargers themselves. You will agree on responsibilities (often you handle site prep, Tesla handles chargers).
Permitting & Utility Coordination: Initiate permits for electrical work, construction, and any zoning updates. Coordinate with the local utility for a make-ready service connection (new transformer, meter, conduit, etc.). Many utilities offer “make-ready” incentives to offset these upgrades. This phase can take weeks to months depending on local processes.
Construction & Installation: Tesla schedules the build. Their installation teams will pour pads, mount pedestals or canopies, trench cables, install hardware and signage. Tesla’s standard approach is fast: some sites report prefabricated components that allow installation in as little as 1–2 weeks once permits and power are ready.
Commissioning: After installation, Tesla tests each charger, integrates payment systems, and activates the site on the Tesla network. Once live, the chargers automatically appear on Tesla’s map (and soon on third-party mapping for NACS adapters).
Throughout this process, Tesla “manages construction and operation” on your site. The host’s project manager role is typically to coordinate permits, utility access, and site prep.
Tesla’s model greatly reduces host costs. Tesla covers:
Charger hardware and installation – Tesla owns the Supercharger units and pays for erection of the equipment and canopies.
Maintenance and Repairs – Any upkeep or repairs on chargers is Tesla’s responsibility.
Electricity at the chargers – Unlike slower destination chargers, Tesla pays the power cost for Supercharger stalls. (Sites are not billed for kWh used; Tesla bills the driver and covers the bill.)
Hosts’ responsibilities and costs typically include:
Site Preparation: Clearing land, grading, paving or restriping parking, installing signage, lighting, landscaping. This often requires capital investment by the host.
Utility Upgrades: If additional capacity is needed, you may pay for transformer upgrades, switchgear, conduits and high-capacity wiring up to the meter. (Many areas have cost-sharing programs, but some expense may be required.)
Permitting Fees: Building permits, electrical permits, zoning variances, signage permits, etc., are at host expense.
Ancillary Infrastructure: If the site uses Wi-Fi, security cameras, or point-of-sale terminals for on-site stores, the host funds those amenities.
In short, Tesla absorbs the electric and charging system costs, while the host pays for real estate and utility infrastructure. The total spend on a full Supercharger bank (8–16 stalls) can range from $250k to $500k+ including site work – but hosts often invest only a fraction, since Tesla funds the chargers.
Example: A typical 8-stall V3 Supercharger installation (approx. 2 MW capacity) might require $100–175k of equipment (hardware + construction). If the host needed a new transformer or major trenching, that could add tens of thousands. But Tesla’s coverage of the charger units means your capital outlay is mainly for pre-installation prep.
While hosts do not charge drivers at Tesla Superchargers, the indirect revenue lift can be significant. Key benefits include:
Increased Foot Traffic: Tesla’s in-car navigation and Tesla app direct drivers to your site. Hosts often see a new base of EV customers who then purchase goods or services. An MIT study found businesses within 1 mile of a new charging station earned roughly $1,500 more per year on average from added spending by EV drivers.
Longer Customer Dwell Time: EV drivers spend 15–45 minutes charging. That “dwell time” translates to sales: coffee shops, restaurants and convenience stores tend to benefit most. (For example, locations near chargers reported upticks in coffee and snack purchases.)
Repeat Visits: Tesla owners travel long distances and rely on familiar charging stops. Your site can gain loyal repeat customers—especially if you offer quality amenities. PulseEnergy notes that hosting can build a “steady stream of new customers” visiting your property.
Brand & Sustainability Image: Being a Tesla Supercharger host boosts your reputation as a green-friendly, future-ready business. This can indirectly improve customer loyalty across your entire brand.
Some hosts even negotiate revenue arrangements. A few partnership models allow site owners to earn a cut of charging fees or to lease space to Tesla at a fixed rent. These models are still evolving, but the real “revenue stream” today largely comes from core business sales generated by the EV drivers you attract. In short, you monetize the spillover of customers coming to charge: parking, meals, shopping, or lodging that they wouldn’t have done otherwise.
Maximizing ROI: To capitalize on EV traffic, consider:
Bundling Offers: Offer discounts or loyalty points for customers who show a Tesla charge receipt (e.g. “10% off lunch if you spend 15+ minutes charging”).
Amenities During Charging: Free Wi-Fi, charging-friendly retail (snacks, beverages), and comfortable seating can encourage spending.
Promotions: Advertise your location as an EV-friendly stop. Many hosts hold Tesla events or offer special deals (e.g. free coffee for Tesla drivers).
Data & Analytics: Work with Tesla (or partners) to understand charging patterns. Peak times can inform staffing and promotions.
Collectively, these strategies can turn the Supercharger into a destination at your site. As one Supercharger host observes, “EV charging stations aren’t just better for the environment; they’re also money printers.
Hosting a Supercharger isn’t risk-free. Be aware of:
Utility Fees and Demand Charges: High-power loads can incur demand charges on electricity bills. Even if Tesla pays the charger energy, any facility upgrades can increase your building’s demand. Work with your utility on tariffs designed for EV charging or install on-site battery storage to shave peaks. (Newer policies and utility programs often offer EV-specific rates.)
Site Work Expenses: Installing light poles, new pavement markings, curbs or canopies can add cost. While Tesla handles the charger equipment, your site might need new concrete pads, ADA ramps, and drainage.
Permitting Delays: High-voltage projects can require multiple permits: electrical inspections, building permits (for canopies or enclosures), environmental reviews, utility interconnection agreements, signage permits, etc. Lead time can be 2–6+ months depending on jurisdiction. For example, California law now expedites EV charger permitting (complete review within weeks), but other areas may still have lengthy processes.
Zoning and Legal: Ensure local zoning permits high-capacity chargers. Some municipalities treat them as “public utilities” or require special use permits. Also consider liability issues: verify your insurance covers EV charging installations.
Contract Terms: Review any host agreement carefully. Clarify who is responsible for site damage, upgrades, or removal if the agreement ends. Seek legal advice if needed.
Utility Coordination Checklist: Before installation, coordinate with your local utility to:
Confirm Capacity: Have the utility perform a load study. If a substation upgrade is needed, understand the cost share.
Apply for Make-Ready Incentives: Many utilities offer rebates or funds to install electric infrastructure (“make-ready”). For example, New York utilities fund EV Make-Ready Programs that cover site wiring costs.
Select Tariff: Choose an electricity rate that fits high-load charging. Time-of-use or EV-specific rates can reduce costs.
Electrical Safety: Plan for transformer placement, switchgear and metering. Ensure compliance with the National Electric Code (charging stations often require GFCI and rapid shutdown features).
By proactively managing these steps (often via a comprehensive permitting checklist), hosts can avoid costly delays. Agencies like the U.S. DOE’s Alternative Fuels Data Center offer streamlined permitting guides (e.g. New York’s DC Fast Charger Guidebook) to help host sites speed approvals.
Hosting Tesla Superchargers delivers ongoing strategic advantages:
Sustainability Branding: Aligns your business with clean energy and sustainability goals. This appeal can attract eco-conscious customers and investors.
Future-Proofing: As EV adoption grows, being charger-ready protects against loss of customers who might otherwise bypass non-EV-friendly sites. Tesla forecasts millions of EVs on the road by 2030; your site will already serve that market.
Increased Property Value: Upgraded electrical infrastructure (transformer, high-service amps) can raise the value of your commercial property. The high-visibility charger signage also acts like free advertising for your location.
Grid Integration & Innovation: Supercharger sites can partner with grid programs. For example, Tesla is exploring battery storage and on-site solar at chargers to lower demand costs. In the future, Vehicle-to-Grid (V2G) and smart charging could allow your site to earn credits by providing grid services. (Note: Tesla’s current Superchargers do not support V2G, but new regulations allow bi-directional chargers).
Overall, Superchargers make your property EV-ready and resilient. You’ll be at the forefront of federal and industry initiatives: e.g., the federal NEVI program allocates billions for EV fast charging, and Tesla’s public-access move qualifies sites for federal grants.
Bundle Services: Consider partnerships (e.g. coffee carts, retail pop-ups) timed to charging events. Packages like “lunch & charge” vouchers can boost onsite spending.
Loyalty Programs: Give Tesla drivers credit or points in your business’s rewards program. Even a small perk (free drink per charge) incentivizes spending.
Marketing & Signage: Use Tesla’s branding (they often allow co-branding) in your own marketing. Display “EV Charger Ahead” signs on your property to attract passersby.
Host Events: Many sites host “EV driver nights” or car meetups. These build goodwill and can generate media attention.
Data Analytics: Work with Tesla or a consultant to analyze charging usage patterns. Align staffing and promotions to peak times (e.g., weekend travel or commuting hours).
These tactics turn the Supercharger from an expense into a profitable amenity. Remember, even though drivers don’t pay you directly to charge, you’re gaining customers’ time and attention – an asset that savvy hosts can monetize in creative ways.
Before finalizing your Supercharger plans, confirm:
Permitting Requirements: Check all local building, electrical and zoning permits needed for EV charging. Use permit streamlining resources (e.g. local EV charging guidebooks or [DOE permitting guide]).
Code Compliance: Ensure charger stalls meet ADA, fire code, and local EV regulations (some areas mandate emergency call boxes or weatherproof enclosures).
Utility Agreements: Sign interconnection and easement agreements if Tesla-owned equipment (transformers, vaults) is on-site. Verify ownership and maintenance responsibilities.
Tax/Insurance Impacts: Consult a tax advisor about claiming the new federal EV charging tax credit (up to 30% of cost with prevailing wages) and ensure your insurance covers the additional site equipment.
Creating a simple checklist covering these points will streamline coordination. For example, California now requires local governments to expedite EV charger permits, and many states have similar initiatives. Don’t hesitate to leverage these: push for expedited reviews or use template documents to avoid unforeseen hurdles.
Several programs can defray your costs:
Federal Tax Credit (IRC §30C): Businesses can claim up to 30% of charging equipment and installation costs (capped at $100,000 per charger) if prevailing wage/apprenticeship rules are met. Otherwise, a base 6% credit applies up to $100k. Nonprofits and municipalities may receive direct payments. Check [IRS guidance] for details.
State & Local Incentives: Many states offer grants, rebates, or tax credits. For example, New York provides tax credits covering 50% of charger costs (up to $5,000). Utility rebate programs (like Make-Ready programs) in California, New York and elsewhere can reimburse infrastructure spending. The DOE’s [AFDC database] lists current incentives by state.
Infrastructure Grants: Through the Bipartisan Infrastructure Law, the government funds EV charging grants. If your Supercharger is open to public EVs (NACS adapters), you may tap into National Electric Vehicle Infrastructure (NEVI) funds indirectly by partnering on corridor projects.
ZEV Programs: Some municipalities and agencies (especially in California and Colorado, for instance) have zero-emission vehicle (ZEV) programs that subsidize fleet or public chargers, which could apply if you host publicly.
Always verify eligibility: many incentives require applications before installation. Working with an EV consultant or your utility can help secure funds. Even absent direct Tesla programs, these incentives significantly improve ROI on hosting.
Whether you’re a licensed EV charger installer, a clean energy brand, or looking to get your commercial property listed for charging opportunities—our platform is built to connect you with the right audience.
We offer several ways to grow your visibility and generate leads:
Reach thousands of property owners, EV enthusiasts, fleet operators, and clean tech investors across the U.S. We offer targeted ad placements across articles, newsletters, and high-traffic directories.
We love teaming up with EV and energy brands to create sponsored content, product placements, and collaborative guides. If your brand is aligned with the future of transportation and sustainability, we want to hear from you.
Reach our subscribers directly by featuring your products or promotions in our monthly newsletters.
Are you an EV installer looking to get discovered by property owners? Get featured in our EV Installer Directory. Our listings help commercial property owners and developers find qualified professionals for their Tesla Supercharger and EV charging projects.
We’re here to help and happy to connect. Our team at Drive On Power is ready to assist you.
Drive On Power may earn a small commission when you purchase through links on our site. As an Amazon Associate, we earn from qualifying purchases—at no extra cost to you.
© 2025 Drive on Power. All Rights Reserved.
Hello! I’ve just placed an order on your website and have completed the bank transfer. Here’s my payment receipt. Please confirm and activate my service. Thank you!
Any questions related to Payment?
WhatsApp Us